Gradient Group, LLC was selected by Harris County Precinct 2 to perform professional engineering and other associated services for the preparation of plans, specifications and construction documents for the construction of the new pedestrian facility (sidewalk) design and pedestrian crossings associated with improving safety adjacent to the Atascocita Middle School. The project scope of work includes design and bid phase engineering services to develop construction documents from Google Earth (saving the County time and money normally spent on surveying) to construct approximately 1,200 linear feet of concrete sidewalk along Tournament Trails from Walden Forest Drive to West Lake Houston Pkwy, 450 linear feet on Lake Houston Parkway from Tournament Trails to Atascocita Middle School and 170 linear feet connecting an internal path from Tournament Trails to Atascocita Middle School Property.